The central feeding system realizes the 24 hours continuous feed operation for the pellets, and can change the colors flexibly to meet the requirements of multi-color and multi-varieties of the products. Depending on the production of different molding machines, flexible changes in the amount of feed. Multiple feed pipe design, to ensure the diversification of the main requirements. The system has a variety of monitoring and protection functions, work safe and reliable. The last Hengrong technicians also introduced the advantages of planning and using the central feeding system in the injection molding workshop, and today we will share the installation precautions for the central feeding system.
Central feed system installation has the following precautions:
1, the size of the machine placed the exact location of the way drainage pipe.
2, pay attention to the raw material room and system control layout.
3, observe the plant wall structure, determine the weight of the pipeline.
4, pay attention to the overhead crane, ceilings, pillars.
5, the central feeding pipe, try to reduce corners.
6, the pipe is allowed to control the condition about 3 meters high, easy to install and follow-up maintenance.
7, when connecting the pipe to ensure that the pipe clamp is the center of the docking, the pipeline is strictly prohibited leakage.
8, pay attention to the installation of pipe injection molding machine in charge of position, so as not to oppose it will not affect the appearance.
On the central feed system installation precautions, we introduce to you here. The ease of use of the central feed system reduces the labor costs and, secondly, the reduction of raw material belts and associated auxiliaries next to the injection molding machine increases space utilization. In addition, due to the central feeding method, correspondingly reduced a lot of stand-alone equipment, it saves energy and reduce maintenance costs, installation and application is very extensive.